Summer construction, like roads and sidewalks, is an important part of helping keep Orangeville on the move. Check out the work underway around Orangeville June 8-12!
· Amanda St. (Front St. to Townline) – local traffic only – sidewalk removal/replacement and road resurfacing
· Andrew Ave. (Dufferin to end of the cul-de-sac) – local traffic only – road reconstruction
· Broadway (Diane to Blind Line) – lane closures – road resurfacing and concrete work
· Bythia St. (Dufferin to end of the cul-de-sac) – local traffic only – road reconstruction
· Bythia St. (Princess to Dufferin) – local traffic only – road reconstruction
· Crimson Crescent (Fourth Ave to Pheasant) – road resurfacing/sidewalks
· Dufferin St. (Erindale to Ontario) – local traffic – road reconstruction
· Dufferin St. (Ontario to John) – local traffic only – road reconstruction
· Green Street (Townline to Chisolm) – local traffic only – road reconstruction
· Ontario St. – local traffic only – concrete repairs and surface paving
· Passmore Ave. (Meadow to Pheasant) – road resurfacing/sidewalks
· Steven St. (Dufferin to end of the cul-de-sac) – local traffic only – road reconstruction
· Victoria St. – local traffic only – concrete repairs and surface paving












