2025 weekly construction updates – summer to fall
- Andrew Ave. (Dufferin St. to end of the cul-de-sac) – local traffic only – road reconstruction
- Bythia St. (Dufferin St. to end of the cul-de-sac) – local traffic only – road reconstruction
- Bythia St. (Princess St. to Dufferin St.) – local traffic only – road reconstruction
- College Ave. and Kensington Pl. (intersection) – milling and paving
- Dufferin St. (Ontario St. to John St.) – local traffic only – road reconstruction
- Hansen Blvd. (Amelia St. to Blind Line) – road resurfacing
- Meadow Dr. (St. Andrews Dr. to Pheasant Dr.) – road resurfacing
- Ontario St. (Princess St. to end) – local traffic only – road reconstruction
- Rolling Hills Dr. (south of Marshall Cres. to Howard Cres.) – road resurfacing
- Steven St. (Dufferin St. to end of the cul-de-sac) – local traffic only – road reconstruction
- Townline (Mill St. to 150m east of Orange St.) – road resurfacing












